Phase 02b

Opening 2026
The first laboratory building you arrive at once at Tribeca from the new bridge link, and with upper floor links to The Connector, but with its own dedicated entrance off Tribeca Square. The building will sit above a vibrant collection of eateries and shops.

Connector Overview

Total Building GIA
97,658 Ft2
Typical Floor GIA
12,188 Ft2
Delivery
July 2026

Building Cross Section

Level
Download
Lab sq ft (GIA)
Terrace sq ft
+06 Sixth Floor
7,293
+05 Fifth Floor
7,293
2145
+04 Fourth Floor
10,699
+03 Third Floor
10,452
+02 Second Floor
10,699
+01 First Floor
10,452
177
+0 Ground Floor
10,195
-1 Lower Ground Floor
80,391 (Shared)
Total Workspace
67,083
*All measurements show Gross Internal Area (GIA)