Assembly
Phase 02b
Opening 2026
The largest laboratory building at Tribeca, totalling 274,148 sq ft plus additional shared basement amenities and with upper floor bridge links to the Assembly building. At the southern end of Tribeca, the building will front Tribeca Square, with a prominent and substantial entrance, and sit alongside the Moorfields Eye Hospital on St Pancras Way.
Assembly Overview
Total Building GIA
274,148 Ft2
Typical Floor GIA
29,278 Ft2
Delivery
July 2026
Building Cross Section
Level
Download
Labs (GIA)
Total Workspace
274,148
Beyond ESG